preparation

Step 1:  Preparation

Preparation includes shot blasting and/or diamond grinding.

Dust is minimized by having all grinders hooked up to vacuum systems.

concrete reconstruction

Step 2: Concrete Profiling

Our menders and fillers are used to fix pits and cracks before the process begins.

basecoat

Step 3: Basecoat

Our 100% solid self-priming pure polyurea basecoat is mixed and applied.

Step 4:  Broadcasting the Chip

Penntek menders and fillers are used to fix pits and cracks before the process begins.

scraping

Step 5:  Scraping The Chip

Once the basecoat is fully cured the floor is scraped and vacuumed to remove any loose or vertical standing flakes.

Step 6:  Concrete Reconstruction

The final step is to roll out the UV stable polyaspartic clear coat.

Our Colors

Click Image Below To View Our Range Of Color Finishes

colors

One Day Concrete Coatings

In 12 Hours…

You can walk on your new floor

In 24 Hours…

You can carry in heavier items

In 48 Hours…

Resume normal use